Introduction to the performance advantages of plastic construction formwork

1. Smooth: The plastic construction formwork is tightly spliced and smooth. The surface and smoothness of the concrete structure after demoulding exceed the technical requirements of the existing clear water formwork. No secondary plastering is required, saving labor and materials.

2. Conducive to maintenance: The formwork does not absorb water and has a good maintenance effect.

3. Easy demoulding: The concrete does not stick to the mold surface, no release agent is required, easy demoulding, and easy to clean.

4. Lightweight and easy to install: light weight, strong process adaptability, can be sawed, planed, drilled, and nailed, and can be combined with accessories to form any geometric shape at will to meet the needs of various shapes of construction formwork.

5. Stable and weather-resistant, high mechanical strength, no shrinkage, no swelling, no cracking, no deformation, stable size, alkali-resistant and anti-corrosion, flame-retardant and waterproof, rat-proof and insect-proof under temperature conditions of -10℃ to +75℃.

BZ hollow plastic formwork factory looking forward to your inquiry!

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *